Allowable
"Late-In-Period" Expenses
Stewardship
and Compliance
Expenses
for the acquisition of materials and supplies late in
the project period (within 60 days of the project "end
date") will routinely be scrutinized to assure that
the expense is allowable and allocable. While such expenses
may be completely appropriate, they will be reviewed
to assure that unspent project funds are not being "used
up" with acquisitions which do not benefit that project.
One
key to the allowability of these expenses is proper
documentation. This includes a written statement from
the Grant or Contract (administrative) Officer authorizing
the expenditure. E-mail is usually acceptable for grants,
but an actual signature may be needed for contracts.
In all cases, a copy of the authorization should be
kept with the project records.
Here
are some real situations:
The
last-minute photographer
A
University staff member conducting a postaward review
of project expenses noticed that an expensive camera
was purchased at the very end of a grant project period.
The camera had unique capabilities related to the
research being conducted, but appeared to be acquired
too late to be of any benefit to the project that
paid for it.
The
PI explained that the technical monitor suggested
that the University use the remaining funds on the
grant to acquire this important piece of research
equipment. The sponsor wanted to see its funds used
to advance work in this area, and the camera was a
good way to do that.
What
the PI did NOT do in this example was get the written
authorization of the Grant Officer for the acquisition.
Upon the suggestion of the staff member, the PI sent
an email to the Grant Officer, and got an "okay"
in return. In this case, the expense of the equipment
was allowed, but, if the reply from the Grant Officer
has been different, the cost could have been disallowed,
and the PI would have had to fund the camera with
her own department funds.
The
final frontier
A
project involves a series of experiments and data
analysis. At the end of the project period, the PI
authorized the acquisition of a desktop computer.
The
PI knew that such an acquisition would be questioned
for at least two reasons: it took place late in the
project, and was for a piece of "general purpose"
equipment.
The
PI sent a request to the Grant Officer reminding him
that, in order to complete the final report for this
project, a particularly intensive amount of data analysis
would be necessary. The approved project budget included
funds to purchase a desktop computer especially for
this analysis. The amount of work to be done, and
the timeframe in which it had to be accomplished,
made it impractical to use existing department equipment
for this task.
The
Grant Officer responded with concurrence, and the
PI gave a copy of the message to the OSR Contract
Officer to keep with the project files.
The
purchase of the computer was allowable, allocable
and reasonable, and therefore appropriately charged
directly to the project.
|