Annex Building Renovations (Lot 7), 3/26

Beginning, Monday, March 26, AAC will be doing abatement and demolition work to begin a 2nd floor renovation project in the Annex building.  This will require 3 spaces being coned off by the loading dock area to have a lull to lower material down and a dumpster for the waste.  The project will run approximately … Continued

Bridge Lot Closed 3/12-16

    Bridge Lot will be closed  for a week beginning Monday, March 12 through Friday, March 16.  RGE needs access to the manholes in this lot. There will be one lane, 2-way traffic along Wilson Blvd. just east of the Wilson Blvd. and Intercampus Drive section.  Minor traffic delays are expected.  Work should be … Continued

Get Ready to Ride – Bicycle Maintenance Seminars on August 15 and 16

Pedaling to work or school is a one-size-fits-all activity that doesn’t require ample technical gear, intense physical training, or a “hardcore” mentality. The benefits of cycling are abundant. You can improve your overall personal health and fitness; reduce both greenhouse gas emissions and traffic congestion; and save on gas, parking and vehicle maintenance. Gain the … Continued

Park. Pay. Be On Your Way.

The new Mobile parking application enables motorists to pay for parking along Wilson Boulevard with a smartphone. PassportParking is a smoother and more convenient app experience. The PassportParking app can be used in spaces on Wilson Boulevard as part of a new custom University-wide mobile parking application. The signs and decals will identify each of … Continued