{"id":712372,"date":"2026-07-31T10:19:13","date_gmt":"2026-07-31T14:19:13","guid":{"rendered":"https:\/\/www.rochester.edu\/newscenter\/?p=712372"},"modified":"2026-07-31T15:30:06","modified_gmt":"2026-07-31T19:30:06","slug":"construction-student-life-building-greenbaum-center-for-jewish-life-712372","status":"publish","type":"post","link":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/","title":{"rendered":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life"},"content":{"rendered":"<h2>A ceremonial groundbreaking is planned for Meliora Weekend.<\/h2>\n<p>Construction will begin in the first week of August on a new Student Life building designed to strengthen and support <a href=\"http:\/\/rochester.edu\">University of Rochester<\/a> Student Life programming and establish a new home for the Greenbaum Center for Jewish Life. The two-story, 15,000-square-foot building on Intercampus Drive, next to Library Lot, will add new gathering, rehearsal, and programmatic space on the River Campus for all students. The second level will be the Greenbaum Center for Jewish Life, a new home for Hillel at the University. The new facility is scheduled to open in fall 2027.<\/p>\n<p>Though planning for this building was <a href=\"https:\/\/www.rochester.edu\/newscenter\/planned-river-campus-building-projects-enhance-student-experience-621042\/\">publicly announced in fall 2024<\/a>, the effort behind it stretches back more than a decade, with fundraising underway for many years. Like the new Joseph P. Mack Catholic Center, the project addresses longstanding space constraints at the University\u2019s Interfaith Chapel. Built in 1970 to serve roughly 4,000 undergraduates and three religious traditions, the chapel today supports 14 religious-affiliated student groups and demand for space has outgrown what it can provide.<\/p>\n<p>Together, the addition of this new Student Life building, along with the interior renovations underway at Interfaith Chapel, will have a positive and meaningful impact on the student experience, in alignment with the University\u2019s <a href=\"https:\/\/boundless.rochester.edu\"><em>Boundless Possibility<\/em> strategic plan<\/a>.<\/p>\n<p>\u201cThis building reflects who we are as a University, a place where every student can find belonging, connection, and space to grow, no matter their background or beliefs,\u201d says URochester\u00a0<a href=\"https:\/\/www.rochester.edu\/president\/about-sarah-mangelsdorf\/\">President Sarah Mangelsdorf<\/a>. \u201cIt\u2019s a meaningful step forward for Student Life at Rochester.\u201d<\/p>\n<p>\u201cWe are proud to present a new space with the future of campus at the heart of the design where the entire URochester community is welcomed to connect, engage, and thrive in what is being conceptualized as an academic, social, and event oasis on campus,\u201d says Vice President for Student Life John Blackshear.<\/p>\n<p>The ground floor\u2019s design is flexible to meet students\u2019 various needs. An open lobby will provide a comfortable place to study or gather informally, while a ballroom that can be split into two sections can also host smaller events and offer dedicated rehearsal space for the University\u2019s dance and other performance organizations. Because performance groups and other student organizations have often had to share the same limited practice areas, this new rehearsal space is hoping to ease scheduling pressures.<\/p>\n<p>A main-level conference room and an upper-level outdoor patio round out the spaces, adding still more room for meetings, programming, and gatherings throughout the year. Included in the building design is an elevated sidewalk lined with planters and benches, which will run along the UHS Building to connect the Student Life building to Susan B. Anthony Circle. A lower patio with picnic tables, ground cover, and mature trees will be located between the two buildings. An upper terrace will be lined with shrubs and flowering perennials, and new, mature trees will be planted around the site.<\/p>\n<h3><strong>A new home for Jewish life on the River Campus<\/strong><\/h3>\n<p>Construction of the Greenbaum Center traces back to lead gifts from University Trustee David Greenbaum \u201973 and his wife, Laureine, who pledged in total $3.5 million with the vision of the Center being a resource for Hillel programming and the broader student community.<\/p>\n<p>\u201cWe are honored to help create a beautiful new campus space where Jewish students at URochester can deepen their identity and feel a true sense of belonging,\u201d says David Greenbaum. \u201cWe are excited to see this vision become a reality and we hope the new Greenbaum Center for Jewish Life will serve generations of Hillel students as a vibrant home for spiritual life, learning, and community.\u201d<\/p>\n<p>The Greenbaum Center will play an important role in enhancing the residential life of the Jewish community on campus and can also serve as a resource to the entire Rochester area Jewish community.<\/p>\n<figure id=\"attachment_713052\" aria-describedby=\"caption-attachment-713052\" style=\"width: 1536px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-713052\" src=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1.jpg\" alt=\"rendering of people seated in a room.\" width=\"1536\" height=\"1024\" srcset=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1.jpg 1536w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1-630x420.jpg 630w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1-768x512.jpg 768w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1-1250x833.jpg 1250w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1-1024x683.jpg 1024w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-inline1-660x440.jpg 660w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption id=\"caption-attachment-713052\" class=\"wp-caption-text\"><strong>SPIRITUAL SPACE:<\/strong> The second-level Greenbaum Center for Jewish Life will serve as a new home for Hillel. (Rendering\/CetraRuddy)<\/figcaption><\/figure>\n<h3><strong>Looking ahead<\/strong><\/h3>\n<p>As construction begins in August, the most immediate and visible impact will be on parking. Roughly half of the Library Lot will be used for construction staging through summer 2027. Existing Library Lot permit holders will retain their permit access throughout construction and are expected to experience minimal disruption.<\/p>\n<p>The Student Life portion of the building is being funded by the University as an investment in the student experience. The Greenbaum Center for Jewish Life is funded through donor funds. To learn about supporting the project, visit the <a href=\"https:\/\/www.rochester.edu\/advancement\/the-greenbaum-center-for-jewish-life\/\">Greenbaum Center for Jewish Life donor page<\/a>.<\/p>\n<figure id=\"attachment_713062\" aria-describedby=\"caption-attachment-713062\" style=\"width: 1536px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-713062\" src=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2.jpg\" alt=\"outdoor rendering of people using space outside of student life building.\" width=\"1536\" height=\"1024\" srcset=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2.jpg 1536w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2-630x420.jpg 630w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2-768x512.jpg 768w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2-1250x833.jpg 1250w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2-1024x683.jpg 1024w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/student-life-building-outdoor-inline2-660x440.jpg 660w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption id=\"caption-attachment-713062\" class=\"wp-caption-text\"><strong>GREEN GATEWAY:<\/strong> An elevated sidewalk lined with planters and benches will accent the new Student Life building. (Rendering\/CetraRuddy)<\/figcaption><\/figure>\n<p>A ceremonial groundbreaking is planned for October 1, 2026, during <a href=\"https:\/\/www.rochester.edu\/melioraweekend\/\">Meliora Weekend<\/a>. <span data-olk-copy-source=\"MessageBody\">The architecture and design firm, CetraRuddy, envisions the building as a place where architecture reinforces community, creating welcoming spaces that encourage connection and belonging, while supporting student well-being.<\/span><\/p>\n<p>For updates as construction progresses, visit the <a href=\"https:\/\/www.rochester.edu\/administration-finance\/capital-projects\/\">University\u2019s Capital Projects Construction page<\/a>. View the project&#8217;s FAQ <a href=\"https:\/\/www.rochester.edu\/parking\/faq-student-life-building-greenbaum-center-for-jewish-life\/\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.<\/p>\n","protected":false},"author":126,"featured_media":713022,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[18612],"class_list":["post-712372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-university-news","tag-announcements"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction begins on new building for Student Life, Greenbaum Center for Jewish Life<\/title>\n<meta name=\"description\" content=\"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life\" \/>\n<meta property=\"og:description\" content=\"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/\" \/>\n<meta property=\"og:site_name\" content=\"News Center\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-31T14:19:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-31T19:30:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building-1200x630.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sara Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sara Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/\"},\"author\":{\"name\":\"Sara Miller\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\"},\"headline\":\"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life\",\"datePublished\":\"2026-07-31T14:19:13+00:00\",\"dateModified\":\"2026-07-31T19:30:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/\"},\"wordCount\":854,\"image\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/fea-student-life-building.jpg\",\"keywords\":[\"announcements\"],\"articleSection\":[\"University News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/\",\"name\":\"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/fea-student-life-building.jpg\",\"datePublished\":\"2026-07-31T14:19:13+00:00\",\"dateModified\":\"2026-07-31T19:30:06+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\"},\"description\":\"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/fea-student-life-building.jpg\",\"contentUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/fea-student-life-building.jpg\",\"width\":2000,\"height\":1200,\"caption\":\"The two-story Student Life building, slated to be complete in fall 2027, will add new gathering, rehearsal, and programmatic space on the River Campus for all students. (Rendering\\\/CetraRuddy)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#website\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/\",\"name\":\"News Center\",\"description\":\"University of Rochester\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\",\"name\":\"Sara Miller\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/author\\\/smiller\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life","description":"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/","og_locale":"en_US","og_type":"article","og_title":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life","og_description":"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.","og_url":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/","og_site_name":"News Center","article_published_time":"2026-07-31T14:19:13+00:00","article_modified_time":"2026-07-31T19:30:06+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building-1200x630.jpg","type":"image\/jpeg"}],"author":"Sara Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sara Miller","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#article","isPartOf":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/"},"author":{"name":"Sara Miller","@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7"},"headline":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life","datePublished":"2026-07-31T14:19:13+00:00","dateModified":"2026-07-31T19:30:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/"},"wordCount":854,"image":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building.jpg","keywords":["announcements"],"articleSection":["University News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/","url":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/","name":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life","isPartOf":{"@id":"https:\/\/www.rochester.edu\/newscenter\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#primaryimage"},"image":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building.jpg","datePublished":"2026-07-31T14:19:13+00:00","dateModified":"2026-07-31T19:30:06+00:00","author":{"@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7"},"description":"The two-story, 15,000-square-foot building on the River Campus will add new gathering, rehearsal, and programmatic spaces for all students.","breadcrumb":{"@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#primaryimage","url":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building.jpg","contentUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2026\/07\/fea-student-life-building.jpg","width":2000,"height":1200,"caption":"The two-story Student Life building, slated to be complete in fall 2027, will add new gathering, rehearsal, and programmatic space on the River Campus for all students. (Rendering\/CetraRuddy)"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rochester.edu\/newscenter\/construction-student-life-building-greenbaum-center-for-jewish-life-712372\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.rochester.edu\/newscenter\/"},{"@type":"ListItem","position":2,"name":"Construction begins on new building for Student Life, Greenbaum Center for Jewish Life"}]},{"@type":"WebSite","@id":"https:\/\/www.rochester.edu\/newscenter\/#website","url":"https:\/\/www.rochester.edu\/newscenter\/","name":"News Center","description":"University of Rochester","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rochester.edu\/newscenter\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7","name":"Sara Miller","url":"https:\/\/www.rochester.edu\/newscenter\/author\/smiller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/712372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/users\/126"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/comments?post=712372"}],"version-history":[{"count":28,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/712372\/revisions"}],"predecessor-version":[{"id":713252,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/712372\/revisions\/713252"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/media\/713022"}],"wp:attachment":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/media?parent=712372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/categories?post=712372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/tags?post=712372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}