Aug. 14: Lot 9 Closed for Pavement Maintenance
On Saturday, Aug. 14, Lot 9 will be closed for crack filling, seal coating, and re-striping. Permit holders may park in Lot 2 during this time. See map: https://www.rochester.edu/parking/wp-content/uploads/2021/08/Lot-9-to-Lot-2.jpg The work…
Aug. 14: Lot 3 Closed for Pavement Maintenance
On Saturday, Aug. 14, Lot 3 will be closed for crack filling, seal coating, and re-striping. Permit holders may park in Lot 14 during this time. See map: https://www.rochester.edu/parking/wp-content/uploads/2021/08/Lot-3-to-Lot-14.jpg The work…
Aug. 14: Lot 12 Closed for Pavement Maintenance
On Saturday, Aug. 14, Lot 12 will be closed for crack filling, seal coating, and re-striping. Permit holders may park in Lot 11 during this time. See map: https://www.rochester.edu/parking/wp-content/uploads/2021/08/Lot-12-to-Lot-11.jpg The…
Aug. 12: River Lot Closed for Maintenance
On Thursday, Aug. 12, River Lot will be closed for crack filling, seal coating, and striping. Permit holders may park in any other Zone 2 North Lot or Zone 3…
Aug. 2-17: Eight Parking Spaces Blocked on Library Rd. for Field House Roof Repair
From Monday, August 2 through Tuesday, August 17, eight parking spaces on Library Rd. will be blocked off to repair the Goergen Athletic Center Field House roof. This includes two…
Aug. 2 and 3: Asphalt Patching in Valentine Lot
Ruston Paving will be making asphalt repairs in Valentine Lot on Monday, August 2 and Tuesday, August 3. The lot will remain open, however, some parking spaces and traffic flow…
July 31 and Aug. 1: Zone 3 South Lot Closed for Maintenance
On Saturday, July 31 and Sunday, August 1, Zone 3 South parking lot will be closed for maintenance, including crack filling, seal coating, and striping. Permit holders may park in…
July 20-Aug 6: Gavett Lot Closed for Water and Fire Protection Work
From Tuesday, July 20 through Friday, August 6, Gavett Lot will be closed while Frederico Construction replaces water and fire protection mains and valves. Permit holders may park in other…
June 22: Crittenden Lot 11 Resurfacing Project Begins Last Phase
Starting Tuesday, June 22, the Department of Transportation and Parking will begin the last phase of a resurfacing project in Crittenden Lot 11. The south entrance/exit of Lot 11 at…
June 13-20: Lot 11 Closed for Paving and Widening of Parking Spaces
From Sunday, June 13 through Sunday, June 20, Lot 11 will be closed for Phase 2 of the Parking Department’s resurfacing project, which includes paving of the lot and widening…
June 7: Four Reserved Parking Spaces Added to Lot 8 (MRB)
On Monday, June 7, the Department of Transportation and Parking will add four additional reserved parking spaces to the back of Lot 8 (MRB). The spaces are designated for volunteers…
June 4-6 and June 11-13: Annual Cleaning of Hospital Garage
The annual cleaning and maintenance of Strong Memorial Hospital Garage will begin on Friday, June 4. Most of the work will be conducted on two weekends in June. Parkers can…
Starting June 3: Zone 1A Parking Impacted by Water Line Replacement
Starting June 3, a water line replacement will impact parking in Zone 1A: June 3-16: Parking spaces will be closed at the Bausch & Lomb loading dock. June 3-23:…
May 24-Aug 20: Trustee Lot Impacted by Roof Replacement on Hutchison Hall
From Monday, May 24 through Friday, August 20, Elmer Davis Roofing will be replacing the upper stack roof on Hutchison Hall, impacting approximately 16 premium parking spaces in the Trustee…
April 30: Special Event to Impact Library Lot
On Friday, April 30, from 7 a.m. to 9 p.m., a portion of parking spots in the Library Lot will be reserved for food trucks and dining areas during the…
April 26: Crittenden Lot 11 Resurfacing Project Begins
Starting Monday, April 26, the Department of Transportation and Parking will begin a resurfacing project in Crittenden Lot 11 that will widen parking spaces and improve lot durability. The north…
Work Dates Updated – Some Spaces Blocked Off in Valentine and Crittenden Lots
WORK IS COMPLETED. From Feb. 16 through April 2, a portion of parking spaces in the Valentine and Crittenden lots will be blocked off for the pulling of cable lines…
March 2-5: Replacement of Water Valves in Lot 6
From Tuesday, March 2 through Friday, March 5, Central Utilities will be removing and replacing two underground water valves in Lot 6. As a result, four parking spaces will be…